An electronics workshop assembles two circuit boards, Board A and Board B. Last week's entire production is recorded as a single matrix equation:
Here is the number of Board A units built and is the number of Board B units built. Each row of the matrix is one resource:
| Row | Resource | Hours per Board A | Hours per Board B | Total hours used |
|---|---|---|---|---|
| Soldering station | ||||
| Testing rig |
The workshop now wants to cost out a third resource that was never written into the matrix. Packing takes hours per Board A and hours per Board B.
How many packing hours did last week's production require?
Answer in hours. The answer is a whole number — give it exactly.